Built for
No Coin runs.
A launcher for Subway Surfers made for speedrunners: a live timer that stops at your first coin, an online leaderboard, run history, friends, and a training mode that serves the pattern you want.

Everything for the grind.
Built around one rule: the run ends at the first coin. Everything else gets out of your way.
No Coin timer
Starts with your run, stops on the first coin or when you crash. Pauses are tracked, so paused runs never count for the board.
Online leaderboard
Best time per player or every run. Switch between everyone and your friends, and open the speedrun.com board in the same window.
Training mode
Pick one of 45 patterns and practice it on repeat, with a schematic preview.
Run history
Every run saved with a progress chart, personal best and average.
Friends and chat
See who is online or playing, chat with them and race on a friends-only leaderboard. Block and report tools keep it safe.
Auto boost
Start every run boosted. Toggle it in the HUD menu and bind your own shortcut.
WASD controls
Play with WASD or the arrows, no setup.
WASDInfinite resources
Unlimited keys, boosters and upgrades. Practice instead of farming.
Replays
Record your runs with sound and the full HUD (timer, keys, coins, best, lost runs) burned into the video. Record every run or only runs above a minimum time, pick quality and fps, choose the save folder, and watch them back inside the launcher.
Custom HUD
Move and resize the timer, best time and “lost runs today” counter, and reset the counter with one click. Pause with Esc and jump back to the launcher.
14 languages
Switch the launcher language on the fly. Profiles keep settings, history and best times per player.
See it in action.
Real screens from the launcher.
Practice any pattern.
Stop waiting for the pattern you struggle with. Pick it and the game keeps sending it.
- 45 patterns per map: coins, tracks, trains, ramps and mixed.
- Search by name plus category filters.
- Schematic preview with the direction of travel, and tooltips for every coin, train and barrier.

Watch yourself improve.
Every No Coin run is saved on your PC, per profile.
- Progress chart with your personal best line.
- Stats: best, average and run count, for all time or the last 20.
- Details: death or coin, map, and a PB tag when you beat yourself.

Training has its own history.
Training runs never touch the leaderboard or your normal history.
- Pattern you trained, with the time of each attempt.
- Map and date for every run.
- One slide away from your normal runs.

Play together.
Add friends by username and always know what they are up to.
- Live status: online, playing or offline, with their best time.
- Chat with a friend without leaving the launcher, with unread badges.
- Safe by design: block and report any user, and offensive names are filtered.

Never lose a great run.
Turn on Replays and the launcher records your runs for you.
- HUD included: timer, keys, coins, best and lost runs appear in the video.
- Your rules: every run or a minimum time, quality, fps, sound and save folder, with a storage limit.
- Built-in player to rewatch, open the folder or delete clips.

From download to leaderboard.
A few minutes from install to your first posted time.
Install
Download the launcher for Windows and run the installer.
Pick a map
Download the map you want from inside the launcher (San Francisco, Zurich and more to come).
Play No Coin
Hit launch. The timer starts with your run and stops on the first coin or crash.
Climb the board
Sign in with a free account to post your time, add friends and track history.
Same game, more places.
Each map runs the real game with its own layout and look. Maps are not bundled with the launcher: you download the ones you want from inside it, and new ones are added over time.
San Francisco
Download it with one click.
Zurich
Download it with one click.
More coming
New maps are added over time.
Who's on top.
Best No Coin time per player, live from the launcher.
One key. Forever.
Preorder now and launch with us on October 26. Pay once, keep it for life. No subscription, no renewals.
- Full launcher: timer, HUD, training, history
- Online leaderboard, accounts and friends
- Both maps, and every new map
- Lifetime access and updates through the launcher
- Preorder: your key is emailed right away and works from launch day
Streamer or content creator?
We are running a closed test before the October 26 launch. If you stream or make videos and want to try Fathom Launcher early, message me on Discord and ask for info.
Good questions.
Quick answers before you start.
What is a No Coin run?
A run where you try to survive as long as possible without collecting any coin. The timer ends the moment you pick one up or crash.
When does it come out?
Fathom Launcher launches on October 26. Until then you can preorder it at the Halloween price of €3.99. Your key is emailed right after you pay and works from launch day.
I am a streamer or content creator, can I try it early?
Yes, there is a closed test before launch. Message me on Discord (7dw8) and ask for info.
Do I need an account?
No. You can play and train without one. An account is only needed to post times to the online leaderboard and to add friends.
Do training runs count?
No. Training runs are kept separate, so they never reach the leaderboard or your normal history.
What does lifetime mean?
You buy the key once and it stays valid. There are no subscriptions and no renewals.
Which systems are supported?
Windows 10 and 11. The launcher is a desktop app and includes everything it needs.
Is my data safe?
Passwords are stored hashed. Your settings, profiles and history stay on your PC; only your account name and posted times are sent to the leaderboard.
Is this official?
No. Fathom Launcher is an unofficial fan project and is not affiliated with Kiloo or SYBO Games.
Need a hand?
Questions, bugs, account or key problems: write to us and we reply by email.
Tip: include your username and what you were doing when it happened. On Discord, add 7dw8 and send a message. In the launcher you can also use the Support link next to the version number.
Ready for your best run?
Preorder the launcher at the Halloween price. It launches on October 26: pick a pattern and start chasing the top of the board.